美国海军压缩泵
美国海军压缩泵
将51周的交货时间缩短至8周,同时降低生产成本
文档
下载 US Navy Reverse Engineer Compressor Pump
Reverse Engineer Compressor Pump Castings with 43 Week Reduction in Lead Time and 40% Cost Savings